News & Media search search close
Read about the latest news on real-time simulation and testing being used around the world in cutting-edge applications
Prototype Converter Control Designs, Test Converters and their Controllers

Prototype Converter Control Designs, Test Converters and their Controllers

Learn about the solutions for the power electronics development and testing workflow end-to-end, from the early development stages until the final implementation.

Testing the FIA-Approved ECUs of Formula One Cars

Testing the FIA-Approved ECUs of Formula One Cars

Validate the FIA-approved electronic control units (ECUs) for Formula One seasons 2026–2030 using hardware-in-the-loop testing. Test within a unified design and testing environment from Speedgoat and Simulink®.

Accelerate Testing of Electric Motor Drive Controller

Accelerate Testing of Electric Motor Drive Controller

Test and validate electric motors and drives within a unified, fully integrated development platform that is rooted in Model-Based Design. By testing at all stages from the same environment, you can assure high quality and enable continuous innovation of controller software.

Innovative Testing of Battery Management System (BMS)

Innovative Testing of Battery Management System (BMS)

Automate the testing of battery management system (BMS) using emulated battery cells. Battery cell emulation allows engineers to safely test various normal and electrical fault conditions quickly, repeatedly, and without the risk of damaging hardware.

Hardware-in-the-Loop Testing to Certify More Electric and eVTOL Aircraft

Hardware-in-the-Loop Testing to Certify More Electric and eVTOL Aircraft

Learn about hardware-in-the-loop testing of more electric and eVTOL aircraft using Speedgoat test systems and the MATLAB® and Simulink® model-based design ecosystem. 

Reference Example | Hardware-in-the-Loop Testing of Grid Protection Relays

Reference Example | Hardware-in-the-Loop Testing of Grid Protection Relays

Test and validate your protection relays against all kinds of faults that are hard to test using the actual grid. Simulate the behavior of the IEEE 13 Node Test Feeder power grid model and monitor the system operation using a Simulink version of the original SCADA dashboard.

Reference Example | Controller Hardware-in-the-Loop Testing for NPC Solar Inverters

Reference Example | Controller Hardware-in-the-Loop Testing for NPC Solar Inverters

Accelerate integration of renewables into existing grids with this reference example featuring a photovoltaic system with a three-phase NPC inverter. Run a digital twin of your grid on a Speedgoat test system to test algorithms such as maximum power point tracking running on the actual controller.

Testing Synthetic Inertia Controllers for Wind Turbine Power Generators

Testing Synthetic Inertia Controllers for Wind Turbine Power Generators

Test synthetic inertia controllers to maintain the stability of the overall grid when adding renewable energy sources such as wind turbine power generators.

Partner Solution Integration | Test Motor Drives at Power Levels up to Hundreds of kW

Partner Solution Integration | Test Motor Drives at Power Levels up to Hundreds of kW

Test your inverters and motor drives at power levels up to hundreds of kilowatts by connecting the power amplifiers from the AVL testbed to Speedgoat test systems. This test setup allows you to safely and quickly test by emulating electric motors and batteries.

Follow Speedgoat LinkedIn